Water Damage & Construction Dryers
Own instead of paying weekly rental fees: steel job-site dryers C9P, C9, and C10 dry screed, plaster, and water damage in unattended 24/7 operation.

C9P / C9WP
Building site, water damage, commercial
The flagship for building sites, water damage and warehouses. The built-in pump lifts water up to 5 m. In black or white.
- Target 10–90% · For drying out and storage.
- Pump button · Pumps out remaining water at the press of a button.
- Filter behind the door · Open the door, take the filter out, rinse.

C9 / C9W
Warehouse, building site, large basements

C10
Plant room, warehouse, underground car park
![]() C9P / C9WP | ![]() C9 / C9W | ![]() C10 | |
|---|---|---|---|
| Extraction¹ | 120 L/day | 120 L/day | 90 L/day |
| Area up to | 300 m² | 300 m² | 200 m² |
| Airflow | 500 m³/h | 500 m³/h | 500 m³/h |
| Water | Pump up to 5 m or slope | 7 L | Direct, 2 m hose |
| Pump | Pump up to 5 m or slope | no | no |
| Humidity target | 10–90 % | 10–90 % | 10–90 % |
| Dimensions | 34.5 × 41 × 66.5 cm | 34.5 × 41 × 66.5 cm | 49 × 32 × 34 cm |
| For | Building site, water damage, commercial | Warehouse, building site, large basements | Plant room, warehouse, underground car park |
| Price | 399,00 € | 369,00 € | 399,00 € |
¹ Maximum extraction at 35 °C and 90% relative humidity. In everyday use the amount depends on temperature and humidity.
Fast structural drying after leaks, floods, or fresh plaster
At €70–€120 per week in commercial rental fees, owning your own auto-restart metal dryer pays for itself in a single 3–5 week drying project.
- Flooded basement without floor drain: C9P (120 L/day¹) with built-in 5 m vertical pump.
- New build & screed with floor drain: C9 (120 L/day¹) with 7 L tank and gravity hose.
- Crawlspaces & low plant rooms: C10 (90 L/day¹) horizontal ceiling/wall dryer with 10 m remote.
Unsure which size fits your room? Try our 3-question sizing calculator or browse all compressor dehumidifiers.
Frequently asked questions
How long should the unit rest upright after delivery?
Stand C9, C9P, and C10 upright for 24 hours before first startup so compressor oil settles.
Do they survive site power outages?
Yes — built-in memory auto-restart resumes your target humidity automatically.


